Fully Refurbished & Upgraded Rotator Set.
Includes Top Mast bracket, Mounting & Clamping Hardware, Plugs for control cable, IEC power cable & Revised manual.
SPECIFICATIONS
Antenna Wind Area (Pole).......... 0.75m Sq x 0.5m
Antenna Wind Area (Tower)....... 1.5m Sq. With thrust bearing
Rotation Torque ………………… 6 kg/m
Brake Torque…………………… 40 kg/m
Vertical Load Max……………… 200 kg
Drive Train………………… Reduction gears with upgraded solid final drive gear.
Brake System………………… BK rotor, Spring & drum assembly on motor
Rotation Range……………… 360 degrees
Rotation Time (360 degrees)… 64 seconds @ 50 Hz.
Rotation End Stops................ Mechanical & electrical
Maximum Continuous Duty..... 3 minutes
Control Cable………………… 5 wire (Pin/terminal 1 (one) not used)
Mast Size…………………… 38~63mm dia.
Rotator Voltage……………… 24 vAC
Rotator Weight……................. 5.5kg Including mast clamps
Controller Weight….. .......... 2.5 kg
The RC Controller: - Refurbished & Upgraded.
Full circle display with LED illumination & other upgrades.
Disassembled, cleaned & prep chassis for new upgrade parts etc.
Upgraded display illumination to LED, by installing one of my yLED-ac PCB's.
The back panel: - Replaced original damaged screw terminal strip with a 6pin CINCH socket mounted on a S/S cover plate (includes a new Cinch plug).
Also installed a new fused IEC 240v socket & earth bolt.
Moved the motor star CAP to the rotator & upgraded the PCB with plug/socket on most wires (mostly rewired).
Re-assembled, fully tested & aligned with the KR-600 rotator.
Includes revised manual, IEC power cable & plugs for the control cable.
The KR-600 Rotator: - Refurbished & upgraded etc.
Completely disassembled, cleaned & checked all parts for damage etc. Refurbished the POT & installed the moved motor start CAP on a new mount. Replaced original screw terminal board etc with a LTW 7 pin chassis socket & mounted on a new cover plate, Fully re-wired, Upgraded the original 7mm gearing shafts with new 8mm version & affixed them into the lower chassis, All gears were bored out to 8mm to suit the new shafts, Replaced the final gear stack with my NEW solid KD-38T-8 gear..
Housings & mast clamps have been Glass Bead Blasted, etch primed & painted in Epoxy Enamel Pewter. Re-assembled with new ball bearings & new grease throughout. Re-aligned & calibrated to the controller.
Includes NEW GAL & stainless-steel mounting & clamping hardware, LTW 7 pin plug.
Control cable needed is 5 core (terminal/pin 1 not used).
24 month warranty.
This unit is available for exchange. See details on my web site.
Contact Peter of DUORO SERVICES via the email service provided by VK Classifieds or via my web site using the links on VK Classifieds.